One day I'll make a web page specifically for my work projects but until then here are a couple of my latest jobs:
 |
The decking, framing, stairs, and upper deck were all rotten.
We tore it all out and started from scratch. |
|
 |
We used site-milled cedar decking
and pressure treated framing. Instead of
winding staircase, we opted to make a
landing an a 90 degree turn. |
|
We then moved our operation to another client, where we turned our attention to a mud-slide down to a rickety landing on the beach. The first job was to replace the landing with something a bit more solid to support the new landscape tie staircase. There is a sandstone wall underneath that mud bobsled track. The rock added complexity by forcing us to work around it, but also let us pin the landscape ties to something very solid.
 |
This is the new landing with the
mudslide above. The rock is only
4-6 inches below the mud. |
|
 |
The new steps. We created a series of boxes made of
8x8 pressure treated landscape ties. They are all, but 2,
pinned into the sandstone with 1/2" rebar. The boxes still
need to be filled with material and top dressed with
mulch or pea gravel . |
|